The original master plan for the HCP called for the space between the two rows of columbaria, what we call the Columbaria Plaza, to be paved from side to side and begining to end.  This paving was dropped to cut expenses and to avoid water drainage issues with the County.

This phase is to partially restore the original plan with just a simple path of pavers suitable for wheel chairs, build on crushed rock for drainage as if they were not there, and colored to complement the columbaria.