As of July 17th, three columbaria have been installed at the top of the wall at the back of the cemetery. They face the Chapel. On July 24th, the stone masons are scheduled to start enclosing the columbaria sides and back with stone matching the wall. The ground in front of the columbaria will be covered with grass. There is a HCP phase 10 which calls for a wheelchair enabled path to be installed running past all three columbaria.
You may view the status of the columbaria below and send a “contact us” message if you have questions or wish to select a niche.